Why it exists
During rare grid emergencies, AEMO can direct NSW electricity networks to temporarily reduce solar exports or pause generation as a last resort. Normal operation resumes after the emergency.
What happens to exports?
Your system may export less electricity, or generation may pause temporarily. This can reduce feed-in credits during an event. The backstop does not itself disconnect your property’s grid supply. Your usual approved export limit still applies outside emergencies.
Does it apply to your system?
Requirements are being phased in by network and postcode from November 2026 for new and upgraded rooftop solar. Existing systems with no changes generally need no action. Ask us to check your connection application and network requirements before an upgrade.
Keep your inverter online
Backstop-enabled systems need reliable internet. Losing communication can trigger a reduced export limit. Check your network’s conditions and reconnect your inverter after changing Wi-Fi or your router.
Learn more from official sources
Read the NSW Government guide ↗
Help reconnecting your inverter ↗
Current rollout information and network links ↗
Information checked 20 November 2026. Network requirements and rollout dates may change.